25% - 50% Reduction in Construction Programme - Client feedback indicates that frame site installation durations can be reduced by 25% - 50% through switching from traditional forms of construction to precast
Reduced Cost - Economies are achieved through reduced formwork, access scaffolding and on-site supervision by the Main Contractor
Factory production - ensures increased accuracy, quality of finish and time/budget certainty
A complete service - from design and manufacture through to installation is available
Proven designs and methodologies - the Concast approach to precast has been developed over many years
Precast has inbuilt one hour fire ratings - reducing or eliminating the need for additional fire proofing and associated costs
Improved programme and budget reliability - through use of a single sub-contractor