Main contractor/Developer: Park Developments ltd.
Architect: O’Mahony Pike
Engineer: DBFL
The New Bancroft site in Tallaght is a mixed development site, with residential and retail areas, in the heart of Tallaght. This is a stylist new development by Park Developments, with O'Mahony Pike Architects and DBFL Consulting Engineers.
Block D was an apartment block, which incorporated curved internal and external wall panels. These panels were cast in Concast's adjustable moulds to a high degree of accuracy.
Block C was the most difficult of these four structures, as it incorporated shopping, offices and residential areas. This involved the use of a transfer structure at first floor to change the use of the structure.
Blocks B and A are a six and eight storey structure respectively, and are again mixed use developments.
Scope of work: All internal walls/ floors/ stairs/ landings, external cladding panels and external balconies.
Total floor area = 55,000 sq. m.