Client/Main contractor: Bowen & Somague
Architect/Engineer: WS Atkins Ireland Ltd.
Concast are currently installing over 7,000 linear metres of prestressed bridge beams, GRC panels, culverts and associated products along the N7 Castletown to Nenagh Motorway, in conjunction with Bowen-Somague, an Irish / Portuguese joint venture. The finished project will include 34 km of high quality dual carriageway, to be completed by the end of 2010, eventually forming part of the M7 / M8 Motorway.
Scope of work: Bridge beams include U Beams, CSU, TY, TYE
Typical spans for U and CSU: 20 - 33 metres
Typical spans for TY: 13 - 18 metres